Description
Solve the problem of local low temperature caused by the large system: effectively improve the problem of low temperature caused by the unreasonable selection of local pipelines, solve the problem of multi-layer supply of wall hanging furnace, and solve the problem of inconsistent flow and temperature of floor heating and radiator mixed installation.
Its biggest characteristic is to ensure that a constant flow system and a variable flow system exist and operate together, effectively protecting the safety of the independent heating equipment system, and improving the efficiency of heating equipment operation.
Installation
Gsec">
Gpr < Gsec
Gpr = Gsec
Gsec">
Gpr > Gsec
| Size | Thread connection | Flow | Volume (mL) | Reference area | Diameter | Length |
|---|---|---|---|---|---|---|
| DN20 | 3/4” | 2700L/H | 747 | 50-150 | φ63 | 282 |
| DN25 | 1” | 4800L/H | 1405 | 100-300 | φ76 | 362 |
| DN32-1 | 1 1/4” | 7200L/H | 2673 | 300-400 | φ89 | 484 |
| DN32-2 | 1 1/4” | 9000L/H | 3511 | 400-500 | φ102 | 484 |
| DN40 | 1 1/2” | 21600L/H | 6804 | 600-1200 | φ133 | 528 |
| DN50 | 2” | — | — | 1200-1500 | φ159 | 670 |
| DN25 | Two Input/Four output | 6600L/H | 1899 | 200-600 | φ76 | 570 |